KitLog pro

Powered By Kitlog Pro v2.0

MARTIN'S WEB SITE
' style=
Date:  10-26-2015
Number of Hours:  8.00
Manual Reference:  
Brief Description:  Elevator Assembly Completion pt. 1

Fabricated hooks and drilled work table to retain rolling pipe for forming the elevator leading edge curves. Seamed and rolled leading edge curve of right elevator. Clecoed rolled edges together and reamed them to proper size. Deburred holes and pulled AD-41-ABS blind rivets to assemble leading edge. Repeated steps for left elevator.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.