Relieved aft edge of gear pocket opening and stretched floor skin upward to provide clearance for elbow fitting. Removed elbow fitting; cleaned; applied more Permatex 2 sealant. Refitted elbow to gear leg; clocking one extra rotation. Refilled brake system; also checked left gear leg which was clean and dry. After 15 minutes checked right fitting; showed signs of oozing. Tested brakes; right brake gradually lost pressure. Less leakage than before, but still leaking.