Date:  8-27-2021
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Wings Final Assembly pt. 3

Routed left wing wiring into conduit. Routed pitot and AOA tubing through rib snap bushings to pitot location. Wrapped OAT probe cable with split conduit and placed in wing; probe location will be determined after wings are bolted on.