KitLog pro

Powered By Kitlog Pro v2.0

MARTIN'S WEB SITE
' style=
Date:  6-6-2021
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Paint Booth Assembly pt. 11

Inserted intake air filter plug and conducted air flow tests. Revised booth/shop access portal; still unsatisfactory; too much air is being pulled from shop. Retrimmed plastic; designed removable plug for booth/shop entry to be fabricated out of thin rigid material.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.