Brief Description: Elevator/Stabilizer Work pt. 21
Unmasked right horizontal stabilizer and test fit right elevator. Removed elevator from horizontal stabilizer; masked right side of aft spar and end rib. Removed jig from work platform; removed work platform and boards from furniture dollies; placed all items in storage. Removed horizontal stabilizer from jig and hung on stand; secured and stabilized. Sanded and smoothed horizontal stabilizer tips. Shaped and sanded left elevator tip; applied Superfil to low areas.