Drilled 3/4" holes in spar box and left gear tower. Drilled 7/16" holes through fuselage skin. Inserted snap bushings in drilled holes. Routed pitot, static and AOA tubes through spar box, up gear tower and out of the top lighening hole, then routed pitot and AOA tubes out of the fuselage. Wrapped with split conduit in critical areas.