Installed empennage, control surfaces, pushrods and control column. Took Tosten CS2 grip to local shop to have pins removed from connector to allow wires to be routed through bushing and stick. Called Van's to get input on stick clearance from bottom of panel and gear tower brace. Measured, cut and drilled front stick for fitting grip. Set up front seat and checked clearances and feel.