Trimmed top flanges of F-808 bulkheads to allow Garmin pitch servo brackets to nest into top of floor ribs. Researched pitch servo assembly and printed out Garmin drawings. Laid out and drilled hole in elevator bellcrank for servo pushrod end bearing. Laid out and drilled rivet holes in pitch servo brackets. Match-drilled floor rivets for bracket rivets.