Powered By Kitlog Pro v2.0
GEOFFREY'S WEB SITE
601XL Quick Build Kit
Landing Gear
1-11-2008
< Previous Log Entry
Next Log Entry >
Date:
1-11-2008
Number of Hours:
3.00
Manual Reference:
Brief Description:
Nose wheel and Strut
Drilled and taped the lower bearing for the nose wheel strut ( for the four 1/4" 28 bolts)
Drilled nose wheel folk ( 6 x 1/4 '' to retain strut to fork and 2 X 3/4 " holes for axle). A step drill made drilling the 3/4" holes easy.
Installed strut and nose wheel.
Waiting for longer bolts to install upper nose wheel bearing
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
601XL Quick Build Kit Home
Category
# Logs
# Hours
All
23
62
Brakes
1
1
Canopy
4
11
Controls
1
2
Empennage
3
6
Landing Gear
6
15
Miscellaneous
3
9
Wings
4
14
Wiring
1
4
Copyright © 2001-2024 Matronics. All Rights Reserved.