KitLog pro

Powered By Kitlog Pro v2.0

Bear with Me!
' style=
Date:  10-18-2015
Number of Hours:  8.00
Manual Reference:  
Brief Description:  Weld punch list and start on flap lever

Welded out all fittings that had been previously tacked. Lot easier now that fuselage back in rottisserie. This included the elevator bellcrank, control stick mounts, bellcrank arms on control stick, and lower brake cylinder mounts.

Had to grind out weld on bellcrank bearing ring and reweld. Got a little stiff.

Started making parts for flap lever.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.