KitLog pro

Powered By Kitlog Pro v2.0

Bear with Me!
' style=
Date:  5-18-2016
Number of Hours:  9.00
Manual Reference:  
Brief Description:  Floorboard Tab Rework

Plan to put is to put 3/4" flange on outside edge of floorboards for stength and finish of wall panels. Problem is straight edge doesn't account for slight curve in bottom longeron. This makes the 1" tabs on the longerons too short. Removed the 1" tabs and replaced with 1 1/2" tabs.

Made the first two floorboard sections.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.