John Bread came by, got a lot done! Tacked side diagonals in place after putting root pass down on crosstube to longeron at STA C crosstube. Cut/fit diagonals above pilot seat and tacked in. Relocated jig boards and completed upper diagonals on pilot side from STA N to STA M. T7 tubing that I had to order arrived and completed diagonals above cargo door.
Added 1/2" x .035 short diagonal and a T-10 above forward cargo door.