KitLog pro

Powered By Kitlog Pro v2.0

Bear with Me!
' style=
Date:  12-8-2014
Number of Hours:  4.50
Manual Reference:  
Brief Description:  Station C/S - Made lots of Chrome Moly dust

This was a challenge, got er dun!
Laid out the 1" tube per STA C/S on table top. Marked and cut miters for bends. Jigged it up and tacked. Then welded the miter cuts fully.

Then I set a plumb vertical with a center line mark 1/2" aft of 15" mark made in previous step. Then I proceeded to sneek up on a good fit with lots of trips to the grinder. After making a lot of chrome-moly dust at the grinders, I got the fit I was looking for.

Tacked in place and called it a night. Good day at the airplane factory.
' style=





' style=

Perfect score!

Perfect score!

' style=

Good fit - takes lots of patience.

Good fit - takes lots of patience.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.