Powered By Kitlog Pro v2.0
Ky Bearhawk Construction site
Bearhawk
All
12-4-2011
< Previous Log Entry
Next Log Entry >
Date:
12-4-2011
Number of Hours:
4.00
Manual Reference:
Brief Description:
Doublers and assembly of ailerons
Started remaking the doublers today out of 2024t3. Got all the aileron and flap doublers done and match drilled. THe boys helped me a lot today.
Cutting out doublers
Match drilling
Assembled the ribs to the spar for both ailerons.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Bearhawk Home
Category
# Logs
# Hours
All
232
464
Aileron/Flap
19
40
Metal Brake
6
6
Priming
19
31
Spars
63
128
Tools
5
3
Wing Assembly
43
84
Wing Ribs
45
104
Wing Steel
32
68
Copyright © 2001-2024 Matronics. All Rights Reserved.