Powered By Kitlog Pro v2.0
Ky Bearhawk Construction site
Bearhawk
All
12-5-2011
< Previous Log Entry
Next Log Entry >
Date:
12-5-2011
Number of Hours:
2.00
Manual Reference:
Brief Description:
Starting Flap rib alignment
Got all the flap nose ribs match drilled to the attach angles and started getting things layed out to do the flap ribs.
Laying out the ribs
Nose ribs drilled and debured
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Bearhawk Home
Category
# Logs
# Hours
All
232
464
Aileron/Flap
19
40
Metal Brake
6
6
Priming
19
31
Spars
63
128
Tools
5
3
Wing Assembly
43
84
Wing Ribs
45
104
Wing Steel
32
68
Copyright © 2001-2024 Matronics. All Rights Reserved.