Cleaned up the top and bottom cowl from yesterdays epoxy coat, mostly had to clean out a lot of drill holes. Installed nutplates for spinner and side hinges. Cleco'd, countersunk, and riveted all 8 hinge pieces. Edge trimmed the inlet ramp, timmed it better to fit, then epoxied them in place. Assembled the cowl with pins in to set overnight.