KitLog pro

Powered By Kitlog Pro v2.0

Greg's RV-14A
' style=
Date:  7-11-2020
Number of Hours:  4.00
Manual Reference:  
Brief Description:  control cables

Cut and installed pilot cabin heat cable. Ran GA26C cable through firewall - had to remove Alt Air and Prop cable to do that. While they were out I enlarged the center hole and upped from a 625 to a 750 bushing so that I could fit three cables through it.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.