Brief Description: static and transponder certification
Taxied the plane across the field to an avionics shop to test the pitot/static and transponder. It took several trips, a leak was discovered and repaired, and the electronics are now ifr certified for the next 24 months. In the process I tested the comm radios and modified the checklists.