KitLog pro

Powered By Kitlog Pro v2.0

Greg's RV-14A
' style=
Date:  3-25-2020
Number of Hours:  6.00
Manual Reference:  
Brief Description:  empennage fairings

Did the edge finish on the gap covers, put them in place then fussed around with further bending until I had a good fit. Following plans they installed one at a time and drilled #40. Lori helped me drill. Got the empennage fairing out and did the edge trim to 1/8" from scribe line then it was on and off a dozen times while sanding high spots. Finally got an acceptable fit, will drill tomorrow
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.