Pulled the horizontal stabilizer and elevators down from the loft. Attached elevators to stabilizer and the to plane and attached the elevator pushrod. Found that there is too much down elevator and not enough up elevator. Tried adjusting pushrod length but no help there, will need to call Vans. Opened up the fuselage wire harness and laid them out. There are some pretty small holes in the fuselage that need to have some pretty large connectors passed through them.