KitLog pro

Powered By Kitlog Pro v2.0

RV-6A - GBC
' style=
Date:  6-2-2011
Number of Hours:  1.20
Manual Reference:  Options
Brief Description:  Removed fuel tanks, review sending units

Removed both fuel tanks and found the new sending units. Reviewed instructions which are rather confusing in that the direction of the floats 'seem' inconsistent with the instructions for installation. The float arm is very long, and must be shortened and bent 90 degs, then snapped into the moving arm of the sending unit.

It will take a little bit of drawing, reviewing, cutting and bending to get it 'right' the first time. The Lt and Rt units are different part numbers, too.

The screw pattern around the sender is ONLY aligned in one position, to prevent installation upside down, or sideways. However the direction of the arm movement is unclear, and not intuitive yet.
' style=

Removed both tanks

Removed both tanks

' style=

Review fuel sending units

Review fuel sending units

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.