KitLog pro

Powered By Kitlog Pro v2.0

RV-6A - GBC
' style=
Date:  11-27-2010
Number of Hours:  1.50
Manual Reference:  Dwg # C2
Brief Description:  Prelim look ahead at wheel fairings

Decided to look ahead at the gear fairings before I put them back on the shelf. (Will try to address all the fiberglass work at the same time --- at some far away time in another galaxy.)

Looked at the drawing (C2) for some guidance, and some other web sites for their experience, then fired up the Laser Level and eye-balled some alignment marks for reference.

Will now let my mind dwell on this for awhile and see if it enhances a later visit to this task. At least I have some idea now of the position of the brackets, cuts, alignment problems and difficulty.
' style=

Laser level on the AFT fairing

Laser level on the AFT fairing

' style=

Sight picture over the top

Sight picture over the top

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.