Finalized the landing light bracket (with rivets) and fabricated a 'test cable' to do function tests on the LL and a battery. Will add additional connector to be able to test the NAV/Strobe and Tail/Strobe harnesses, too.
Cleaned up the fiberglass 'patch' on the rudder fairing, and roughed up the gelcoat cracks for repair. Ned to drill new screw holes for two locations. Needs more layers of glass on the inside of fairing.
Fabricated a bracket to secure/guide the Pitot/AOA tubing to the alum connectors on the Pitot/AOA. Added tubing protection by splitting some hose and placing on vulnerable areas of tubing.