More electrical work on exterior lights, connectors and wiring. Some progress on the Pitot/AOA tubing.
Gene came in to help, too. He worked on the pitot/AOA mast & tubing fittings. Flared the tubing and added fittings. Waiting for the wings to be mounted and plastic pitot/AOA tubing to be routed. Can now be torqued.
Added connectors to the tail/strobe, for a DB9 (used only 4 pins). The pigtails 'should' be about two ft long, keeping the DB9 connectors closer to the hinge end of the rudder (weight) and facilitating the mount point, too.
Worked on landing light brackets. Needs to be accessible for adjustment through the LE lens area and easily removable.