KitLog pro

Powered By Kitlog Pro v2.0

RV-6A - GBC
' style=
Date:  5-2-2014
Number of Hours:  2.00
Manual Reference:  
Brief Description:  VP-100, wiring harnesses

Clip all the tie-wraps and organized the harnesses for the VP-100. new tie-wraps on each J- connector, routed to the pivot rail forward of subpanel. This will allow the VP-100 platform mount to swing down while completely connected, and full access to the connectors.

Attached Dynon 36" SV-net cable from EMS to area of SV-1000, but may decide to mount a SV-Hub on the top side of the VP-100 swing tray, and reconnect there.

Routed SV-net cables from the roll & pitch servos to equipment bay. Routed 'soft-start' power cables which will power the landing light (left wing) and taxi light (right wing). Attached Molex pins on the "Red Cube" fuel transducer.
' style=

Left side -

Left side -

' style=

Right side -

Right side -

' style=

Pivots down on rail

Pivots down on rail

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.