More alignment work, this time on Lt side top/bottom hinge.
Filed and sanded the extra material add last night to better fit 'ring' mating surfaces.
Aligned Lt side top hinge half and match-drilled the hinge remaing holes to cowl. Then added the 0.025" AL strip of backing material (to strengthen edge), and match-drilled that.