KitLog pro

Powered By Kitlog Pro v2.0

RV-6A - GBC
' style=
Date:  9-8-2012
Number of Hours:  3.20
Manual Reference:  
Brief Description:  Forward structure & canopy hinges

Finished match-drilling the ribs and patches for the new hinge blocks, aligning and fitting.

Finally a light coat of gray primer (self-etching) to add uniformity to the look. Touch up the area of new work and refresh the look.

After some minor tasks, I'll torque the bolts to spec, seal with a little torque paint and dimple the forward top skin. Then it will be ready for the more canopy work.
' style=

Match drilled & assembled

Match drilled & assembled

' style=

Rib patch & re-drilled

Rib patch & re-drilled

' style=

Forward sub structure

Forward sub structure

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.