KitLog pro

Powered By Kitlog Pro v2.0

RV-6A - GBC
' style=
Date:  2-11-2016
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Flaps - Position & misc

Installed the XPNDR antenna in forward floor, right side, with a 2"x3" doubler.

Other misc tasks, including finishing the harness to the Ray Allen POS-12 Flap Position sensor.

Reviewed Flap POS configuration - deciding on the VP-X configuration vs the SkyView & EMS integration. This will still display the flap operations on the EFIS but via the Serial data stream from the VP-X to the EFIS.

Setup laptop to configure Flap Position parameters and mid-point values for Automatic flaps but failed to get position movement activity. Back to the documentation and details for the POS-12, and realized the sensor was not moving because it had no link to the flap control arm. Manually manipulated the sensor and established limits and intermediate starting values. Need to fabricate the linkage.
' style=

XPNDR Antenna

XPNDR Antenna

' style=

POS-12 sensor (no link)

POS-12 sensor (no link)

' style=

POS-12 wiring (Temp)

POS-12 wiring (Temp)

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.