Powered By Kitlog Pro v2.0
RV-6A - GBC
RV-6A QB
Avionics
11-20-2014
< Previous Log Entry
Next Log Entry >
Date:
11-20-2014
Number of Hours:
1.00
Manual Reference:
Brief Description:
SkyView - Panel wiring review
Received the SV-D1000 (10" display EFIS) 2nd hand - and reviewed the SV Installation Manual for power connection requirements (wiring, and fuses).
Will be able to work on this Sat and fire it up for testing. Ken coming over to visit and will assist with the Vertical Power (VP-100) issues.
Main harness already connected to the comm wiring harness and GPS. Have AP harnesses installed and may need to finish terminations.
SV-D1000 front
SV-D1000 back
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
RV-6A QB Home
Category
# Logs
# Hours
All
1255
3573
Avionics
77
222
Controls
50
143
Electrical
133
440
Empennage
48
140
Engine
126
392
Finishing Kit
165
457
Fuel System
51
156
Fuselage
317
864
Gear
37
87
Miscellaneous
45
109
None
9
13
QuickBuild RV-6A Kit
6
5
Shop Supplies
1
1
Tools
12
20
Wings
147
455
Workshop
31
69
Copyright © 2001-2024 Matronics. All Rights Reserved.