KitLog pro

Powered By Kitlog Pro v2.0

RV-6A - GBC
' style=
Date:  4-6-2016
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Hoses, baffles, & wires

Cleaned up the fittings for the oil cooler hoses, sealed and 'clocked' them to routes for the final hoses. (Need fire-hose).

Prepared for final connections of FWF wires and hoses. Baffle adjustments to tighten up airleakage.

Got some Proseal from Gordon who recently resealed a fuel tank, Cartridge instructions a bit confusing but figured it out, and will do both tanks (sending unit covers) by Sat.

Need to order specific fittings for FWF, (MAP & a 45deg for fuel), and a 1/4" from FI servo to distribution block.
' style=

Hose to oil cooler

Hose to oil cooler

' style=

Hose from oil cooler

Hose from oil cooler

' style=

Proseal for tank closures

Proseal for tank closures

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.