KitLog pro

Powered By Kitlog Pro v2.0

RV-6A - GBC
< Previous Log Entry          Next Log Entry >
' style=
Date:  2-7-2017
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Empennage fairing - and more

Worked on the empennage fairing, again. Minor additions of resin/glass to fill and then sand/file to get alignment right.

Sanded off the wingtips where a thin coat of resin was applied to fill pin-holes and recesses. Getting closer.

Other preparation for DAR Inspection. Recorded data for logs, and worked on the POH, W&B scenarios and checklists.
' style=

Fairing - left side fit

Fairing - left side fit

' style=

More sanding and filling

More sanding and filling

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.