Removed the baggage bulkhead to access the tailcone, to adjust washers on the elevator control tubes. Re-checked and torqued all fasteners.
Added the tunnel cover to the baggage compartment. Attached the co-pilot harness to the fuselage anchor cable. (Need to trim & heat seal excess strap)
Rolled out in the sun, closed canopy and fired up the panel & iPad. Tested the fans in the X-Nauit fans to maintain operational temps. Glass in iPad was too hot to touch more than 5-10 secs but did not shutdown. Promising but may still need a Koger Shade to protect the equipment from direct sunlight and be 'sunlight readable'.