KitLog pro

Powered By Kitlog Pro v2.0

RV-6A - GBC
' style=
Date:  9-20-2016
Number of Hours:  4.60
Manual Reference:  
Brief Description:  Fiberglass - everywhere

After riveting the elev fairings there was a slight shift ofrward and the HS fairing was too cloe - so sanded off the aft side and need to reseal with resin. Both L & R sides.

Due to a little intereference on the R rudder cable near the pedal end (hits the bulkhead grommet) I decided to adjust the rudder sop to the L and limit the travel slightly. Well inside the range of motion limits so it's a slight change. Ordered new AL angle to fabricate teh stop.

Added another layer of FG tape and resin to the canopy failring (fwd) and fill the curve a little more before sanding the finally contour down. Then added a quick coat of micro with black colorant.

Tested the ability to place some wt on the HS to "tie down" the tail for a fuel flow test at TO attitude. Need to confirm flow capacity.
' style=

interfeence potential

interfeence potential

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.