KitLog pro

Powered By Kitlog Pro v2.0

Michael's Cozy Web Site
' style=
Date:  7-3-2014
Number of Hours:  6.00
Manual Reference:  Step 8
Brief Description:  Canard Covers

I constructed seven small metal plates that I riveted the camlock receptacles onto. I formed some H45 PVC to hold the camlock receptacle plates. Two have been placed on F28. I took this time to also make a flox corner at the top of F28 to the beginning of the canopy where there was some exposed foam. I floxed the foam to the BID layed up over F28 and covered it with one BID to hold it to F28. Three are going to be installed along the from edge, slightly embedded into the nose top wall.

I also covered the underside of the canard cover with 2 BID. I layed up an extra two BID along the front and back edge to provide more rigidity. I did not have enough MGS 335 resin to finish the bottom so I switched to MGS 285 resin.
' style=

Camlock receptacles

Camlock receptacles

' style=

Layup on the underside of the canard cover

Layup on the underside of the canard cover

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.