KitLog pro

Powered By Kitlog Pro v2.0

Michael's Cozy Web Site
' style=
Date:  10-30-2008
Number of Hours:  11.50
Manual Reference:  Step 5
Brief Description:  Routing and Rigging the Rudder Cables

10/30/2008 I made up the foam molds for the electrical conduit and layed down 2 plys of BID
11/03/2008 I fit the conduits into the fuselage and used clecos to keep them in place. I floxed on the pilot side.
11/09/2008 I floxed in the conduit on the co-pilot side using clecos to keep it in place.
11/29/2008 I floxed in the rudder cable tubing. The tubing is NyloFlow brake tubing.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.