KitLog pro

Powered By Kitlog Pro v2.0

Michael's Cozy Web Site
' style=
Date:  9-21-2019
Number of Hours:  2.00
Manual Reference:  Step 9
Brief Description:  Piping the Pitot and Static System

I installed the static ports on both sides of the fuselage in the locations indicated by the plans. The holes are drilled and a simple pressure test was completed to verify integrity.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.