08/20/2007 I skipped ahead to start on the NG-30 bulkheads. I traced out the NG-30 from M-10. M-11 and M-19. Then I cut them out of H100 tan PVC. I marked each hole that will need to be drilled. I placed a piece of peel ply around the MKG6A pivot point and layed up 2 BID on top of it for 2" on each side. I peel ply'd it and turned it over and weighted it down. 08/21/2007 I layed up 4 BID layers on inside of each NG-30 08/22/2007 I trimmed the NG-30's, nailed them together and trued them up by sanding the edges. I made the 1/4" birch doubler, 1/4" alum insert, and the 1/8" alum double for the MKNG6 hardpoint. 03/22/2008 I trimmed out the foam for the hard points and cut the glass for the hard points 03/23/2008 I layed up the hard points, the MKGN6 hard point and layed up 4 layers of BID over the entire outside of the NG30 and 2 more over the MKNG6 hardpoint 03/27/2008 I drilled out the holes and cut out the foam on the inside of NG30 over the MKNG6 hardpoints 03/28/2008 I layed up 2 BID on the inside of NG30 over the MKNG6 hardpoints and peel ply'd