KitLog pro

Powered By Kitlog Pro v2.0

Michael's Cozy Web Site
< Previous Log Entry          Next Log Entry >
' style=
Date:  8-20-2007
Number of Hours:  22.00
Manual Reference:  Step 2
Brief Description:  Fabrication of NG-30s

08/20/2007 I skipped ahead to start on the NG-30 bulkheads. I traced out the NG-30 from M-10. M-11 and M-19. Then I cut them out of H100 tan PVC. I marked each hole that will need to be drilled. I placed a piece of peel ply around the MKG6A pivot point and layed up 2 BID on top of it for 2" on each side. I peel ply'd it and turned it over and weighted it down.
08/21/2007 I layed up 4 BID layers on inside of each NG-30
08/22/2007 I trimmed the NG-30's, nailed them together and trued them up by sanding the edges. I made the 1/4" birch doubler, 1/4" alum insert, and the 1/8" alum double for the MKNG6 hardpoint.
03/22/2008 I trimmed out the foam for the hard points and cut the glass for the hard points
03/23/2008 I layed up the hard points, the MKGN6 hard point and layed up 4 layers of BID over the entire outside of the NG30 and 2 more over the MKNG6 hardpoint
03/27/2008 I drilled out the holes and cut out the foam on the inside of NG30 over the MKNG6 hardpoints
03/28/2008 I layed up 2 BID on the inside of NG30 over the MKNG6 hardpoints and peel ply'd
' style=

NG-30 Foam

NG-30 Foam

' style=

NG-30 layups

NG-30 layups

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.