KitLog pro

Powered By Kitlog Pro v2.0

Michael's Cozy Web Site
' style=
Date:  1-21-2007
Number of Hours:  21.50
Manual Reference:  Step 4
Brief Description:  Landing Gear Cover

01/20/2007 I started the tedious job of masking the lip edge for the landing gear cover. Not finished yet.
01/21/2007 Finished masking the lip edge. Started to cut and fit the foam. I placed wood supports using 5 min epoxy on top of duct tape for quick release. Still need to shape the entry hole for the landing gear.
01/27/2007 I epoxied all of the landing gear cover foam together using micro. It may still need som trimming around the landing gear strut opening
01/28/2007 I shaped the foam. Micro'd the duct area and layed down 3 plys BID at 45°.
02/09/2007 I taped up the rest of the foam on the cover and cut the BID
02/10/2007 Micro'd the rest of the cover outside of the duct area and layed down 3 plys BID at 45°.
02/11/2007 I seperated the cover and removed all of the tape. I trimmed the cover to fit around the LG Strut.
02/17/2007 I shaped the foam on the underside of the LG Cover.
02/23/2007 I layed doen 2 BID tapes on the flanges and 1 BID layer overall.
03/02/2007 Trimmed the flanges to shape. Drilled three holes and decided to wait until I purchased the threader.
03/04/2007 I purchased the threader and tapped the holes. I cut a recess for the screw heads. Then I Drilled the rest of the holes and finished Step 4.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.