08/09/2006 Started to build the frame to allow the fuselage to be rotated. 08/10/2006 Finished the frame to allow the fuselage to be rotated. 08/11/2006 Cut the 2 layers UND at alternating 30° and 1 UND parrallel to the longerons 08/12/2006 Nancy and I layed the 2 UND @ 30° from the upper longeron and 1 UND parrallel to the longeron. Then we layed up the reinforcing UND plys at the upper longeron, the 3 UND plys at the engine mount and the 1 BID at the engine mount. All of this was on the right side. 08/13/2006 I sanded down the edges of all the glass. Inspection of the layup does show a couple of bubbles that I will try to inject epoxy after the other side is glassed. 08/16/2006 Kenneth and I cut out the glass for the left side of the fuselage. 08/18/2006 Nancy and I layed the 2 UND @ 30° from the upper longeron and 1 UND parrallel to the longeron. Then we layed up the reinforcing UND plys at the upper longeron, the 3 UND plys at the engine mount and the 1 BID at the engine mount. All of this was on the left side.