KitLog pro

Powered By Kitlog Pro v2.0

Michael's Cozy Web Site
< Previous Log Entry          Next Log Entry >
' style=
Date:  1-13-2006
Number of Hours:  13.00
Manual Reference:  Step 6
Brief Description:  Completion of the Fuselage Sides

01/13/2006 Set up electrical conduit form and layed up 1 Bid overit.
01/14/2006 I had to redo the conduit. I had mismeasured. I formed the foam for the aft.
01/15/2006 I 5min epoxied the conduit in place. I micro'd the foam into place
01/17/2006 Cut out the 6 plys for each landing bulkhead area. Layed them up and peel ply'd
01/19/2006 Popped the sides from the jigs today. Micro epoxied the large chunks back in and filled in a number of smaller holes.
01/22/2006 Trimmed the sides to 101.75". Still need to clean up the aft foam against the firewall
01/24/2006 Repaired the air bubbles in the longeron 4 ply tape.
01/28/2006 Finished the sides. I lost the file and have had to recover.
' style=

The finished FS Inside from aft

The finished FS Inside from aft

' style=

The finished FS Inside from front

The finished FS Inside from front

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.