Brief Description: Cutting the Jigs and Laminating the Top Longerons
12/02/2005 Started to mark up the doublers 12/03/2005 Cut out FJA, FJB, and FLC. Attached them to the table as a jig for the longerons 12/05/2005 Cut out the longeron doublers and LWX, LWY 12/14/2005 Epoxied the stringers together. 12/16/2005 Epoxied the stiffener, forward doubler, and aft doubler 12/19/2005 Finished the upper longerons.