KitLog pro

Powered By Kitlog Pro v2.0

Michael's Cozy Web Site
< Previous Log Entry          Next Log Entry >
' style=
Date:  11-27-2020
Number of Hours:  4.00
Manual Reference:  Step 1
Brief Description:  Rudder Control Brackets

The repair was complet and fiberfrax installed over the new studs and a stainless shroad over that. The rudder brackets were installed. The pulleys were installed in each one. The cable retaining cotter pin was installed.
' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.