KitLog pro

Powered By Kitlog Pro v2.0

Michael's Cozy Web Site
< Previous Log Entry          Next Log Entry >
' style=
Date:  11-20-2020
Number of Hours:  6.00
Manual Reference:  Step 2
Brief Description:  Firewall Insulation and Liner

To prepare for installing the firewall insulation and SS liner, all of the equipment that was mounted on the back was removed. In addition, I decided to install blind nuts on all equipment to avoid the need for two people. The equipment removed is listed below.

1. Fuel flow transducer
2. Oil and Fuel Pressure Manifold.
3. Rudder Brackets
4. Aileron torque tubes
5. Engine Mount
6. Ignition Coils
7. Tank Vent Manifold
8. All tubing support for tank vents
9. Forest of Tabs for G1 Ground Block
10. ANL fuse holder for the alternator B Lead
' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.