All of the major components have been mounted except for the auto pilot panel. That was just ordered today and will be available for install soon. The Knob panel and the radio panel are the same cutout, so those were used as templates. The radio stack for the Garmin 430W and the PS Engineering PS360EX audio panel were also finished and installed.
In preparation for connecting the elevators to the control rods, I checked the balance before installing them again in the canard. They do not balance individually, so I will need to add weight to the outboard counterweight. I have ordered some lead to facilitate this.