KitLog pro

Powered By Kitlog Pro v2.0

Michael's Cozy Web Site
' style=
Date:  7-27-2019
Number of Hours:  50.00
Manual Reference:  Step 2
Brief Description:  Course filling to Contour

I have not entered an entry in a while; however, I have been busy each week filling and countouring the bottom of the fuselage and strakes. When I finished the coarse filling , I did the Cory Bird Epoxy wipe overrr the entire bottom. I am currently in the process of sanding the eqoxy wipe wiith 150 grit.

I also installed a fairing around the gear leg. I used the technique suggested by Wayne Hicks on his website.

I painted the landing gear cover with primer as a test piece. I sanded it down with 220 grit. It showed several high spots so I will need to respray this piece again. I am using Delron DPS3055 V-Prime Acrylic Urethane Surfacer as a primer.Thye did not produce the white primer any longer.
' style=

Bottom is basically contoured

Bottom is basically contoured

' style=

Gear Leg Fairings

Gear Leg Fairings

' style=

First painted part - landing gear cover

First painted part - landing gear cover

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.