KitLog pro

Powered By Kitlog Pro v2.0

GA Aerospace’s Web Site
' style=
Date:  3-17-2021
Number of Hours:  0.00
Manual Reference:  
Brief Description:  N-19-10-16 Compliance

Black nylon step plugs were installed.

Step 1: The bottom surface of the steps were drilled #40.
Step 2: The inside of the step was cleaned.
Step 3: A thin smear of fuel tank sealant was applied around the inside of the steps.
Step 4: Tthe step plugs were insterted into the ends of each step.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.