Date:  2-7-2020
Number of Hours:  10.97
Manual Reference:  
Brief Description:  50iS/U-07

01/27/20: 2.56Hrs
1. The oil tank was installed onto the firewall using the two band clamps.
2. A piece of H177 Hose was cut to 8".
Worked on step 3.

01/29/20: 0.58Hrs
3.FF-1219-1 was clamped to the tank and to FF-1218-1.

02/05/20: 4.16Hrs
4: FF-1219-1 was placed over the stem on the oil tank and clamped to it.
5: FF-1218-1 was inserted into FF-1219-1 and clamped as well.
6: FF-1218-1 was bent to follow the stiffener on the firewall and was clamped to it.
7: FF-00022 and F-00023 were attached to the oil tank.
8: FF-1221-1 was trimmed as needed. Since it was not painted as instructed, this step will have to be reworked
9: Does not apply
Worked on step 10

02/06/20: 3.25Hrs
7: This step had to be re-done because the it was easier to complete step 7 without the oil tank on the way.
8: As mentioned on yesterday's log, FF-1221-1 was primed.
Worked on step 10.

02/07/20: 0.42Hrs
10: The cushioned clamps were installed as instructed and the AAPTS was routed through the