Date:  1-23-2019
Number of Hours:  3.25
Manual Reference:  
Brief Description:  16-02

01/22/19: 0.75Hrs
1. Two holes were final-drilled #30 on VA-195A and VA-195B and were countersunk only on VA-195A.

01/23/19: 2.5Hrs
2. One hole was final-drilled #19 on VA-195A and VA-195B and was countersunk #19 on VA-195A.
3. The holes and the parts were deburred.
4. The stal warning was assembled.
5. WH-B217 was trimmed and crimped.
6. The stall warning was installed onto the eight nose rib inboard to outboard of the left wing assembly.
7. The W-1202-L skin was clecoed.