Date:  1-22-2019
Number of Hours:  5.50
Manual Reference:  
Brief Description:  15-05

01/21/19: 3.5Hrs
Nose ribs were clecoed and riveted to the left spar and to their respective flange in the following order:
1. 5 aft-trimmed, fwd-untrimmed W-1208-R.
1 aft & fwd untrimmed W-1208-R.
1 aft & fwd untrimmed W-1208-R with two nutplates.
1 aft & fwd untrimmed W-1208-R.
4 aft-untrimmed, fwd-trimmed W-1208-R.

01/22/19: 2Hrs
1 aft-untrimmed, fwd-trimmed W-1208-L.
1 aft&fwd trimmed W-1208-R with one nutplate and W-00028 attached.

6. The left stub spar was clecoed and riveted to the forward flange of the 6 most inboard nose ribs.
7. 14 snap bushings were installed.
8. 12 holes/rib were dimpled #30 on the 2nd to last and 3rd to last most inboard ribs.