KitLog pro

Powered By Kitlog Pro v2.0

GA Aerospace’s Web Site
' style=
Date:  11-30-2020
Number of Hours:  3.30
Manual Reference:  
Brief Description:  42NiS-22

08/21/20 .8Hrs

1: The GA 36 was installed on the F-01201R-1.
2: The TNC connector lebeled GPS was connected to GA 36.

11/30/20 2.5 Hrs

3 the Upper Forward Skin was reinstalled.

4: The entere electrical sistem was checked. It was ensured that there aren't potential spot where wires may chaft or surrounding structure.

5: The software configuration was update with the lasted version for G3X GDU460 GARMIN.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.